







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterTub to Shower Conversion Cost in Cutler Bay, FL
Tub to shower conversion cost in Cutler Bay runs $3,500 to $10,000, with most full conversions landing around $6,000 to $8,500 once you include permitted drain work, new waterproofing, tile, and a glass enclosure. That range assumes the wall behind the tile is sound. Roughly half the conversions we scope in Cutler Bay turn up deteriorated greenboard or a failed pan liner once the old tub and tile come out, which is why we price remediation in writing before demo starts. Call (833) 620-5491 for a free estimate with a real number on paper.

Key Takeaways
- Most Cutler Bay tub-to-shower conversions cost $3,500-$10,000; complex jobs with drain relocation and solid-surface thresholds reach the higher end.
- Greenboard-era backers from 1980s-2000s construction fail behind the tile in South Florida humidity, and remediation belongs in the estimate, not the invoice.
- A drain configuration change requires a plumbing permit and a licensed plumber under Miami-Dade rules – skipping it creates an open liability on a four-point inspection.
- Bradford Remodeling Co Cutler Bay puts the waterproofing product, backer spec, fixture brand and tile line in the written price before work begins.

Why Half Our Cutler Bay Conversions Start With a Backer Board Problem
Cutler Bay is a build-out town. It incorporated in 2005 largely to control its own growth, and most of its housing is 1980s-2000s subdivision and townhome construction on former farmland and pine rockland west of US 1. That construction era matters directly to your conversion. Greenboard drywall, not cement backer, was the standard tub surround substrate before cement board became code-required, and in coastal South Florida humidity greenboard starts to deteriorate after 15 to 20 years. When we pull the original tile on a Saga Bay or Old Cutler Bay bathroom from that era, the backer is often soft, mold-stained, or holding moisture against the studs.
A contractor who prices the conversion without budgeting for that condition is writing a low number that will move at the door. That’s the pattern most of our customers describe before they call us. It’s also why the remediation line sits in our written estimate from the start: if demo confirms the greenboard is shot, the fix was already scoped and priced, not discovered as an add-on.
What Drives the Price: An Itemized Breakdown
Here’s how a tub-to-shower conversion in Cutler Bay breaks down line by line. Cast iron tubs weigh 200-400 lbs and cost more to remove and haul than acrylic or fiberglass, so demo swings the total more than most homeowners expect.
| Line item | Cutler Bay price range |
|---|---|
| Demo and haul-away (cast iron adds cost) | $400-$900 |
| Drain relocation vs. reuse (permit and plumber if drain moves) | $600-$1,800 |
| Greenboard remediation and new cement backer | $700-$1,600 |
| Waterproofing membrane | $500-$1,200 |
| Tile and grout | $1,200-$3,500 |
| Fixture swap (valve, head, trim) | $400-$1,100 |
| Glass door or enclosure | $900-$2,500 |
| Solid-surface bench or threshold (Cambria or Caesarstone) | $600-$1,500 |
The overall conversion totals $3,500 to $10,000 depending on how many of those lines apply. If your goal is the wider picture of upgrading the room around the shower, our Bathroom Remodeling in Cutler Bay page covers vanity, lighting, and layout scope, while this page stays focused on the tub-out, shower-in job.

The Permit Question You Can’t Skip
If the drain configuration changes during the conversion, Miami-Dade requires a plumbing permit and a licensed plumber on the work. That is not optional, and it is where budget conversions cut corners. A tub drain and a shower drain sit in different places, so most conversions move the drain – meaning most cutler bay jobs need the permit.
The hidden cost of skipping it shows up at resale or insurance renewal. An unpermitted conversion reads as open liability on a four-point inspection, and carriers in this market are already strict about wind-mitigation documentation. Nearly every Cutler Bay job also runs through Miami-Dade’s post-Andrew hurricane code, the High-Velocity Hurricane Zone, which drives product selection and scheduling. We factor the permit cycle into the written schedule rather than discovering it mid-job.
Why Solid Surface at the Threshold Beats Tile
Tile over cement at a shower threshold takes daily foot traffic and standing water in a hot, humid climate. Grout lines open, water gets behind the edge, and the failure hides until it shows. A solid-surface threshold or bench in Cambria or Caesarstone carries an upcharge of $600 to $1,500, and it outperforms tile-over-cement at that wet-zone edge because there are no grout joints to fail. Same logic applies to the bench: a solid slab sheds water where a tiled ledge holds it.

What “Squared Away” Looks Like at Close
Bradford Remodeling Co Cutler Bay is part of the Garrison Partners family, independently owned and operated and held to The Garrison Standard. That framework shapes four things on every conversion:
- A written price before any work starts, naming the waterproofing product, the backer board spec, the fixture brand and model, and the tile line. Our technicians have up to 22 years of experience, and the estimate reads like a spec sheet, not a guess.
- The 365-Day Done Right Promise on every completed project. If the work fails inside that window, we come back and correct it at no charge.
- Background-checked, uniformed technicians, so you know who is walking through your door before the crew arrives.
- A clean site and a signed written guarantee in your hand at job close.
We work from a documented roster of name-brand materials – Kohler and Moen fixtures, Cambria and Caesarstone surfaces among them – so every specification is traceable. If your wider Bathroom Remodeling plans include cabinets or a new vanity, that roster extends to KraftMaid and Wellborn lines as well.
When a Conversion Is the Wrong Call
If you’re keeping the tub and the shower is the only upgrade, a shower replacement or a walk-in shower install may fit your budget better than a full conversion. If the room needs layout changes, a full remodel is the honest answer. We’ll tell you which category your job lands in during the free estimate, with a written number for each path.
FAQs
A tub-to-shower conversion in Cutler Bay typically costs $3,500 to $10,000, with most jobs landing between $6,000 and $8,500. The price depends on drain relocation, backer condition, and whether you choose a solid-surface threshold. Call (833) 620-5491 for an exact written quote – estimates are free.
Soft tile backer in Cutler Bay is almost always greenboard drywall that has absorbed moisture over 15 to 20 years in coastal humidity. It was the standard substrate in 1980s-2000s construction, and it fails behind tile. We scope remediation in the written estimate before demo, so it never shows up as a surprise charge. Call (833) 620-5491 to schedule an inspection.
Yes, if the drain configuration changes. Miami-Dade requires a plumbing permit and a licensed plumber for drain relocation, and an unpermitted conversion shows up as an open liability on a four-point inspection. We handle the permit as part of the written scope. Call (833) 620-5491 with your address and we’ll confirm what your job requires.
We can often schedule estimates within a few days and factor Miami-Dade’s permit cycle and summer rain days into the written timeline. Live people answer our phone 24/7, so you get a real answer on scheduling, not a voicemail. Call (833) 620-5491 for the next available slot.
Get Your Written Price Before Demo Starts
Every conversion we price in Cutler Bay comes with a written number covering waterproofing, backer spec, fixtures, tile, and the permit – so the greenboard surprise never becomes an invoice surprise. Call Bradford Remodeling Co Cutler Bay at (833) 620-5491 for a free estimate and a real figure on your tub-to-shower conversion.
Written by the team at Bradford Remodeling Co Cutler Bay, serving Cutler Bay, FL.
What Our Customers Say
"Great work. Countertop install slipped by a week, but they explained and kept us informed."
- Nora L."Respectful crew. Covered the floors and swept every day."
- Jackie T."Painting and drywall repair were flawless. They patched the drywall seams and the paint matches the old wall."
- Cal P.












